wiki/projects/telic-field-papers/artifacts/hi-2-navigation-projection
Telic Fields HI-2 — Navigation, Gates, and the Projection Boundary
wiki/projects/telic-field-papers/artifacts/hi-2-navigation-projection/index.mdRendered from markdown source. Open raw source on GitHub.
--- title: "Telic Fields HI-2 — Navigation, Gates, and the Projection Boundary" artifact_date: "2026-07-15" artifact_type: "paired-technical-and-public-pass" domain: "TELIC-FIELDS" scope: "WORKING" lineage: "THE-TELIC-FIELD-PAPERS" status: "working" processing_tier: 4 source_role: "derived-technical-and-public-architecture-artifact" content_canon_status: "unset" publication_status: "unpublished" series_position: "HI-2" ---
Telic Fields HI-2 — Navigation, Gates, and the Projection Boundary
Parent lineage: The Telic Field Papers
Source artifacts
I.2 technical branch
- I.2 navigation, gate, and DecisionWitness specification
- Navigation, gate, and authority matrix
- Decision-method adapter matrix
H.2 public branch
Gate, witness, and validation
- HI-2 gate review
- HI-2 validation report
- Generated DecisionWitness
- Decision event stream
- Witness context
- Witness generator
- Decision-witness export
Positive demonstrations and supporting records
- PD-1 two Pareto-efficient routes
- PD-2 protected condition blocks efficient route
- PD-3 missing standing pauses action
- PD-4 route portfolio
- PD-5 event-generated DecisionWitness
- PD-6 consequence-driven route revision
- PD-7 model recommendation boundary
- Cost-bearer records
- Hybrid gate example
I.2 candidate schemas and tests
- Ten candidate I.2 schemas
- Negative conformance fixtures
- Validation results
- Validation runner
- Complete HI-2 intake package
The complete package passed its internal SHA-256 manifest before intake. The ZIP hash is c88df5eb5b86da0932e670f5d15865a067c623214ef2316033fbdba50ef8559d.
Working focus
HI-2 completes I.2 and H.2 as a phase-locked pass. I.2 keeps route comparison plural and non-scalar where appropriate, makes protected conditions noncompensatory under current authority, represents missing standing as a pause condition, composes governance gates, preserves no-decision and route-portfolio states, generates DecisionWitness records from event streams, revises routes after consequences, and keeps model recommendations separate from authorization.
H.2 explains field, projection, and receiver mirror; bounded consent; private and shared channels; inference laundering; correction before disclosure; and witness without merger or total surveillance.
The package reports ten candidate schemas, seven positive demonstrations, twelve detected negative patterns, an event-generated witness, and an independently checked decision-witness export. These are structural and internal semantic validations, not production security, legal compliance, scientific validity, fairness certification, or public-reader comprehension.
Gate and boundaries
HI-2 is complete at v0.1 with a PASS WITH CONDITIONS gate. Remaining conditions include authenticated standing and protected-condition authority, cost-bearer discovery, decision-rule sensitivity, production event-store testing, independent route/gate review, strategic-manipulation threat modeling, and independent reader testing.
The I.2 specification, H.2 page, schemas, demonstrations, and witness export remain working/candidate artifacts. They do not become canonical or production specifications by installation.
Roadmap transition
The next paired pass is HI-3 — Context Capacity and Legitimate Stop: I.3 Context Capacity, Stop, and Escalation Specification alongside H.3 When the System Should Stop.