wiki/projects/telic-field-papers/artifacts/g10-deliberative-decision
Telic Fields G.10 — Navigation, Deliberation, and Multiobjective Decision Review
wiki/projects/telic-field-papers/artifacts/g10-deliberative-decision/index.mdRendered from markdown source. Open raw source on GitHub.
--- title: "Telic Fields G.10 — Navigation, Deliberation, and Multiobjective Decision Review" artifact_date: "2026-07-15" artifact_type: "decision-method-and-claim-boundary-review" domain: "TELIC-FIELDS" scope: "WORKING" lineage: "THE-TELIC-FIELD-PAPERS" status: "draft" processing_tier: 4 source_role: "research-and-claim-boundary-artifact" content_canon_status: "unset" publication_status: "unpublished" ---
Telic Fields G.10 — Navigation, Deliberation, and Multiobjective Decision Review
Parent lineage: The Telic Field Papers
Source artifacts
- G.10 navigation, deliberation, and multiobjective-decision review
- F.9/G.10 decision-method comparison and boundary matrix
- F.9/G.10 route-governance checklist
- F.9/G.10 candidate navigation record
- Complete F.9/G.10 intake package
The complete package passed its internal SHA-256 manifest before intake. The ZIP hash is 1060284d19132773d0bba4cc6f5911f848ceec9b3a230bc01891b62d11fc0176.
Working finding
G.10 grounds polytelometric navigation beside multiobjective optimization, MCDA and outranking, value-focused thinking, problem structuring, robust decision-making, scenario planning, computational argumentation, negotiation support, social choice, deliberative democracy, Polis, Human–AI deliberation, and mixed-initiative systems.
The clearest candidate addition is a source-, standing-, consent-, and lifecycle-aware admission layer before and around established decision methods. It preserves nonaggregable fields, protected conditions, missing standing, cost bearers, route alternatives, no-decision states, representation fairness, adaptive consent, and decision witness.
G.10 remains a research and claim-boundary artifact. The navigation record and route-governance checklist do not replace domain-specific legal, professional, democratic, or fiduciary process, and are not production specifications.
Roadmap transition
G.10 is complete as a working review package. F.10/G.11, F.11/G.12, and FG-S are now installed. The next pass is HI-0 — Controlled Branch Opening before deeper H.1 or I.1 branching.