wiki/projects/telic-field-papers/artifacts/hi-10-consentful-deployment

Telic Fields HI-10 — Consentful Deployment, Runtime Authority, and Model Succession

wiki/projects/telic-field-papers/artifacts/hi-10-consentful-deployment/index.md

Rendered from markdown source. Open raw source on GitHub.

--- title: "Telic Fields HI-10 — Consentful Deployment, Runtime Authority, and Model Succession" artifact_date: "2026-07-15" artifact_type: "paired-technical-and-public-pass" domain: "TELIC-FIELDS" scope: "WORKING" lineage: "THE-TELIC-FIELD-PAPERS" status: "working" processing_tier: 4 source_role: "derived-technical-and-public-architecture-artifact" content_canon_status: "unset" publication_status: "unpublished" series_position: "HI-10" ---

Telic Fields HI-10 — Consentful Deployment, Runtime Authority, and Model Succession

Parent lineage: The Telic Field Papers

Source artifacts

I.10 technical branch

H.10 public branch

Gate, validation, and export

Positive demonstrations and deployment records

I.10 candidate schemas

The twelve candidate schema sources are preserved under the standard-named source directory, with the SCHEMA__CANDIDATE__I-10 prefix: deployment field assembly, deployment standing, runtime-purpose authority grant, capability/role/tool grant, deployment consent/notice/refusal, runtime memory/output capture, deployment drift event, deployment incident/repair, runtime monitoring/consequence return, operator/provider transfer, model succession/retirement, and consentful-deployment witness.

Intake archive

Package SHA-256: 7b40450c6827a605e175b88835536f820243c837c0d316f52852c0642b944c29

The complete package and its independent deployment-witness export passed their internal SHA-256 manifests before installation. The standard-named copies are byte-preserving source copies; the inbound ZIP and extracted contents remain in the intake archive.

Working focus

HI-10 completes I.10 and H.10 and closes the candidate H/I sequence. It treats deployment as a new field; admits runtime standing without training contribution; separates capability, role, tool access, and authority; governs notice, consent, refusal, runtime data recruitment, purpose drift, meaningful review, affected-center repair, consequence monitoring, operator/provider transfer, model succession, rollback, retirement, and residual obligations.

The package reports twelve candidate schemas, eight positive demonstrations, twelve negative conformance fixtures, an event-generated ConsentfulDeploymentWitness, an independent deployment-witness export, and zero technical/public contradictions. These are structural and internal semantic validations, not legal authority, consent sufficiency, clinical safety, cybersecurity, complete compensation, complete residual-state deletion, scientific validity, or public-reader comprehension.

Gate and boundaries

HI-10 is complete at v0.1 with a PASS WITH CONDITIONS gate. Remaining conditions include runtime-standing scale, tool-token overreach, consent fragmentation, cumulative drift, incident minimization, dynamic model-version opacity, retirement abandonment, and independent public-reader testing.

The I.10 specification, H.10 page, matrices, schemas, demonstrations, fixtures, and export remain working/candidate artifacts. Installation does not make them canonical or production specifications.

Roadmap transition

HI-10 closed the candidate H/I sequence. HI-S — H/I Cross-Branch Synthesis, Conformance Freeze, and J Transition — is now installed and validated. The active next pass is J.0, a bounded reference implementation and pilot-harness phase that must not promote research claims into production guarantees.