wiki/projects/telic-field-papers/artifacts/f7-dependent-loops
Telic Fields F.7 — Dependent Loops and Telic Incompatibility
wiki/projects/telic-field-papers/artifacts/f7-dependent-loops/index.mdRendered from markdown source. Open raw source on GitHub.
--- title: "Telic Fields F.7 — Dependent Loops and Telic Incompatibility" artifact_date: "2026-07-15" artifact_type: "candidate-foundational-paper" domain: "TELIC-FIELDS" scope: "WORKING" lineage: "THE-TELIC-FIELD-PAPERS" status: "candidate" processing_tier: 4 source_role: "derived-conceptual-artifact" content_canon_status: "unset" publication_status: "unpublished" series_position: "F.7" ---
Telic Fields F.7 — Dependent Loops and Telic Incompatibility
Parent lineage: The Telic Field Papers
Source artifacts
- F.7 dependent-loops paper
- F.7/G.8 dependent-loop comparison and boundary matrix
- F.7/G.8 loop-dissolution checklist
- F.7/G.8 dependency and compatibility record
- Complete F.7/G.8 intake package
The complete package passed its internal SHA-256 manifest before intake. The ZIP hash is 14c0d6db12fdddc8101e30afb4635c7d5c1b76e2641a42e9bbeec07ca737ba0e.
Working focus
F.7 establishes that no derived loop is self-grounding. It develops constitutional substrate, legitimate and extractive dependence, form versus loop, telic compatibility and incompatibility, hidden outer-loop recruitment, isomorphic mimicry, premature load bearing, path dependence, lock-in, mission and operative-telos divergence, specification gaming, goal misgeneralization, fork, succession, residual state, dissolution, and aftercare.
The candidate dependency record makes substrate, authority, consent scope, cost-bearing, exit routes, compatibility, lock-in, review, forkability, dissolution, and residual state explicit. The dissolution checklist treats ending a loop as a governed transition rather than erasure or an escape from obligations.
The package explicitly keeps biological graft language as lineage/essay-only and prohibits essentialist or xenophobic use. F.7 remains a candidate paper and does not become canonical or a production specification by installation.
Roadmap transition
F.7 is complete as a candidate working paper. F.6/G.7 are now installed and the former provenance gap is closed. F.8 and G.9 are installed as the next conceptual and research pair, followed by F.9/G.10.