artifacts/standard-named
HI-S Validation Report
artifacts/standard-named/20260715__TELIC-FIELDS__VALIDATION-REPORT__WORKING__HI-S__structural-and-semantic-validation.mdRendered from markdown source. Open raw source on GitHub.
HI-S Validation Report
Status: completed Validation date: 2026-07-15
Cross-branch coverage
The H.0–H.10 public path and I.0–I.10 technical branch were mapped one to one.
Result:
public pages with technical homes: 11 of 11
technical specifications with public explanations: 11 of 11
blocking orphan concepts: 0
Contradiction audit
Result:
blocking contradictions: 0
qualified tensions: 8
material implementation omissions: 6
publication-only omissions: 4
The qualified tensions are:
- consent versus other authority bases;
- standing versus veto;
- protected conditions versus rhetorical absolutes;
- witness versus total visibility;
- correction versus historical rewriting;
- withdrawal versus exact unlearning;
- human re-entry versus human supremacy;
- conformance versus legitimacy.
Each tension now has a frozen qualification.
Consolidated schema validation
Six Draft 2020-12 common schema families were checked:
center-standing.schema.jsonsource-projection-context.schema.jsonpurpose-authority-role.schema.jsonroute-gate-action-consequence.schema.jsonevent-witness-contest-repair.schema.jsonlifecycle-transfer-residual.schema.json
Result:
schemas checked: 6
schema errors: 0
common schema families: 6
reference records validated: 15
Reference scenario validation
The TF-MVI-1 scheduling scenario proved:
failed gate: true
valid action: true
correction propagation: true
retirement revocation: true
conformance claim valid: true
The blocked morning route failed a protected access condition.
The approved evening route passed under operator confirmation.
A participant correction changed a preference into a protected access requirement and propagated into the route set.
Retirement revoked model and tool authority while preserving bounded witness.
Threat-fixture validation
All ten cross-branch threat classes were detected:
threat cases detected: 10
- source laundering;
- standing exclusion;
- context collapse;
- authority laundering;
- consent expansion;
- model-role escalation;
- tool-token overreach;
- correction suppression;
- witness capture;
- lifecycle obligation loss.
Independent export validation
The Stage J input export contains:
- six common schemas;
- the reference scenario records;
- event stream;
- conformance manifest;
- reference witness;
- threat fixtures;
- validation results;
- manifest;
- checksums.
Result:
checksums verified: 17
checksum failures: 0
provider independent: true
Terminology and conformance freeze
The following are validated as Stage J candidate vocabulary:
TF-C0 — Witnessable Record
TF-C1 — Source and Standing
TF-C2 — Purpose, Authority, and Consent
TF-C3 — Contest, Correction, and Exit
TF-C4 — Model, Tool, and Action Boundaries
TF-C5 — Lifecycle, Transfer, and Successor Obligations
The earlier P0–P3 labels remain historical evidence and are superseded for implementation planning.
Scope of validation
This validation establishes internal structural coherence only.
It does not establish:
- legal or regulatory compliance;
- clinical, financial, legal, or civic safety;
- empirical proof of telic-field theory;
- production cybersecurity;
- universal community-standing rules;
- public-reader comprehension;
- standards-body adoption;
- certification status.
Result
PASS WITH CONDITIONS
Conditions before Stage J:
- implement the action gate outside the language model;
- preserve provider-independent event and witness storage;
- include one failed gate, one correction, and one retirement;
- select identifier and event-store rules;
- implement selective disclosure;
- confirm repository D and E status before claiming integrated installation;
- complete independent public-reader testing before publication claims.