artifacts/standard-named
HI-5 Validation Report
artifacts/standard-named/20260715__TELIC-FIELDS__VALIDATION-REPORT__WORKING__HI-5__structural-and-semantic-validation.mdRendered from markdown source. Open raw source on GitHub.
HI-5 Validation Report
Status: completed Validation date: 2026-07-15
Schema validation
Twelve candidate Draft 2020-12 schemas were checked:
supporting-loop-reference.schema.jsondependent-loop-record.schema.jsonsubstrate-contribution-map.schema.jsonsupport-authority-grant.schema.jsonsupport-burden-record.schema.jsonhidden-recruitment-event.schema.jsontelic-compatibility-assessment.schema.jsondrift-record.schema.jsonlock-in-capture-profile.schema.jsonfork-exit-record.schema.jsondissolution-residual-state.schema.jsondependency-witness.schema.json
Result:
schemas checked: 12
schema errors: 0
Positive demonstrations
All eight required demonstrations passed:
- a legitimate dependency remained visible, bounded, reciprocal, reviewable, and escapable;
- hidden recruitment was detected and paused;
- a copied process failed under constitutional substrate mismatch;
- material mission drift triggered reauthorization;
- support burden became disproportionate and stopped expansion;
- continued recruitment after authority withdrawal produced a capture finding;
- a governed fork preserved lineage without preserving shared sovereignty;
- dissolution preserved records, obligations, repair, restricted data, and final witness.
Result:
positive demonstrations passed: 8
positive failures: 0
Negative conformance cases
All twelve prohibited patterns were detected:
- self-grounding fiction;
- continued support treated as consent;
- repeated hidden recruitment treated as authority;
- output success erasing support burden;
- visible form treated as compatibility;
- material drift without reauthorization;
- textual exit without effective release;
- support recruitment continuing after authority withdrawal;
- dissolution preserving assets while abandoning obligations and harms;
- biological pathologizing of telic incompatibility;
- fork erasing shared history;
- forced preservation of a loop when dissolution is the legitimate repair.
Result:
negative cases detected: 12
undetected negative cases: 0
Dependency witness
The DependencyWitness preserves:
- declared and operative purpose;
- supporting loops;
- substrate contributions;
- support grants;
- support burdens;
- hidden recruitment;
- compatibility assessments;
- drift;
- lock-in and capture;
- fork;
- dissolution;
- correction.
Result:
dependency witness schema: PASS
generated_from_events: true
dependency encoded as pathology: false
biological claims: false
Independent dependency export
The export contains:
- supporting-loop references;
- dependent-loop record;
- substrate map;
- support grant;
- eight demonstrations;
- dependency event stream;
- DependencyWitness;
- schemas;
- manifest;
- checksums.
Result:
checksum files verified: 26
checksum failures: 0
independent of originating model: true
Public-page consistency review
H.5 was checked against I.5 for the following claims:
- no derived loop is self-grounding;
- dependence is not inherently illegitimate;
- support must remain visible and authorized;
- repeated use does not create consent;
- matching form does not prove substrate compatibility;
- material drift requires review or reauthorization;
- maintenance burden remains visible despite successful output;
- textual exit may be ineffective;
- support continuing after withdrawal can constitute capture;
- fork preserves lineage while separating authority;
- dissolution may preserve more of the purpose than preserving the form.
Result:
technical/public contradictions found: 0
Scope of validation
This report establishes structural and internal semantic validation only.
It does not establish:
- a clinical theory of dependency;
- a biological theory of transplant rejection;
- a universal organizational-health metric;
- legal findings of coercion or capture;
- economic proportionality in every domain;
- completeness of hidden-support discovery;
- production security;
- public-reader comprehension;
- scientific proof of the broader framework.
Conditions before production use
- define domain-specific burden and materiality thresholds;
- authenticate support grants, withdrawals, and transfers;
- test practical exit and portability;
- define independent capture-review authority;
- test compatibility assessment against real process migration;
- implement dissolution record custody and deletion;
- test contributor challenge and correction;
- conduct independent reader testing of H.1 through H.5.