artifacts/standard-named
Stage J Opening Recommendation
artifacts/standard-named/20260715__TELIC-FIELDS__RECOMMENDATION__WORKING__J-0__stage-j-opening.mdRendered from markdown source. Open raw source on GitHub.
Stage J Opening Recommendation
Status: approved candidate transition Version: 0.1
J.0 — Reference Implementation and Pilot Harness
Objective
Build the smallest inspectable system that demonstrates the Telic Field constitutional chain end to end.
Required components
1. Event store
Must support:
- portable event identifiers;
- valid and recorded time;
- append-only history;
- correction and supersession;
- idempotent replay;
- export.
2. Six common schema families
- Center and Standing
- Source, Projection, and Context
- Purpose, Authority, Consent, and Role
- Route, Gate, Action, and Consequence
- Event, Witness, Contest, and Repair
- Lifecycle, Transfer, and Residual State
3. Participant interface
Must support:
- scoped projection;
- consent and refusal choices;
- correction;
- review of model summary;
- witness export.
4. Model adapter
Must preserve:
- assigned role;
- output class;
- source references;
- uncertainty;
- generated-option authorship;
- zero standing and authority effect.
5. External action gate
Must enforce:
- operation scope;
- authority;
- consent or other basis;
- protected conditions;
- tool permission;
- target authority;
- context adequacy.
The gate must not rely on the language model's self-report.
6. Scheduling tool simulator
Must support:
- read availability;
- prepare candidate;
- reject unauthorized commit;
- execute authorized commit;
- return witnessed result;
- revoke credentials.
7. Consequence and correction harness
Must demonstrate:
- observed burden or access result;
- participant correction;
- propagation into active context and next route;
- repair or route revision.
8. Retirement harness
Must demonstrate:
- runtime grant expiry;
- credential revocation;
- optional-memory deletion;
- bounded archival witness;
- open-obligation accounting.
9. Independent verifier
Must validate:
- checksums;
- schema conformance;
- event chain;
- gate result;
- correction propagation;
- retirement state.
10. Adversarial suite
Must include all TF-MVI-1 negative tests and relevant threat fixtures.
Recommended implementation boundary
local-first
single bounded scenario
simulated scheduling tool
one model provider adapter
provider-independent event and witness store
no production personal data
Stage J success criterion
J.0 succeeds when an independent verifier can prove:
the source remained attributable
the affected centers retained standing
the authority was scoped
the model remained non-sovereign
the tool gate blocked one invalid action
one valid action occurred
the consequence returned
the correction changed the operative system
retirement ended authority
the witness remained portable
Explicitly deferred
- production deployment;
- formal standards submission;
- certification program;
- legal or clinical claims;
- automated public adjudication;
- broad plugin ecosystem;
- universal telic ontology.
Recommended next package
J0-REFERENCE-IMPLEMENTATION-AND-PILOT-HARNESS__v0-1