artifacts/standard-named

J.1 Demonstration Transcript

artifacts/standard-named/20260715__TELIC-FIELDS__DEMO-TRANSCRIPT__WORKING__J-1__hardened-reference-scenario.md

Rendered from markdown source. Open raw source on GitHub.

J.1 Demonstration Transcript

Status: generated from the deterministic reference scenario

1. Initial field

Participant A:

Weekday mornings are preferred.

Participant B:

Evenings are preferred because daytime transit is difficult.

The initial context is revision 1 under authorization policy version 1.

The model produces a summary and two candidate schedules.

2. Participant correction

Participant B corrects the representation:

Evening attendance is required because daytime transit is inaccessible.

The system:

  • records the contest and correction;
  • changes the projection to a protected access condition;
  • supersedes context revision 1;
  • publishes context revision 2;
  • supersedes policy version 1;
  • publishes policy version 2;
  • blocks the prior route objects;
  • creates a complete correction-reachability report.

3. Stale route test

The system tests the pre-correction evening route.

Although the time is evening, the gate denies it because:

context current: false

No token is issued.

4. Current route comparison

Tuesday 10:00

Result:

DENY

The protected accessible-transit condition fails.

Wednesday 18:30

Result:

PASS WITH CONDITIONS

The route has:

  • current context revision 2;
  • active policy version 2;
  • operator confirmation;
  • target authority;
  • active tool credential;
  • passing protected condition.

The external gate signs a short-lived token with gate-k2.

5. Partial tool failure

The tool reserves the slot and then simulates commit failure.

The transaction compensates by releasing the reservation.

status: compensated
external state restored: true

6. Key rotation

The gate rotates to gate-k3 and revokes gate-k2.

The old token is rejected.

The route is re-evaluated and receives a new token signed with gate-k3.

7. Action

The scheduling simulator commits:

Wednesday 18:30

8. Consequence

Participant A:
  attended at a less preferred time

Participant B:
  attended within the accessible transit window

Shared result:
  both participants attended

The record preserves the distribution of cost rather than only aggregate success.

9. Selective witness

The exporter creates:

  • public view;
  • participant view;
  • operator view;
  • verifier view.

The public view omits direct protected source language and participant-specific consent details while preserving commitments.

10. Retirement

The pilot:

  • expires runtime authority;
  • revokes the tool credential;
  • deletes optional memory;
  • preserves the bounded event witness;
  • retains one open review obligation.

11. Independent verification

The standalone verifier imports no implementation package and reports:

checksums: PASS
manifest signature: PASS
schemas: PASS
event chain: PASS
selective commitments: PASS
required proofs: PASS